Integration of Power, Electric and HVAC Systems for a Global-Brand Data Center

Most data centers operate with a 24X7 high availability mandate. Every effort must be taken to ensure against any system failing — from the servers’ internal processors to the power and chilled water systems that keep servers running and cooled. There needs to be redundant backup systems for every contingency. The Whirlpool Corporate data center in Benton Harbor, Michigan, has been operating with near 100% uptime, in part thanks to an integrated controls system with Niagara Framework® at its core.

 

Please feel invited to download the full case study to learn, how Niagara helped improving the overall performance of the Data Center.

Please fill the form below to download the case study.

*Required fields

Yes , I authorize Tridium to receive my personal contact details data for the purpose of sending Tridium information on products, services, and/or events. For more information, please view the Tridium privacy policy here: https://www.tridium.com/us/en/privacy-statement